Premium Mesh Fabric Supplier for Shoe Material Processing

HSU JENN ENTERPRISE CO.,LTD.

Hot Product

News

Why Hsu Jenn?

 

🎯 Four Pillars That Set Us Apart

 

1. Vertical Integration, One-Stop Production

Most textile suppliers offer one thing: fabric. We go further. From greige fabric to finished laminated materials, every step—dyeing, heat setting, lamination, and quality inspection—happens under our roof. This means tighter quality control, faster lead times (15–20 working days), and fewer coordination headaches for your procurement team.

 

2. 40+ Years of Footwear Expertise

We've spent four decades perfecting our craft. This isn't general-purpose textiles—this is footwear-specific engineering. Our materials are designed for the unique demands of athletic shoes: breathability under stress, durability through thousands of flex cycles, and performance that holds up from the factory floor to the finish line.

 

3. Supply Chain Partnership with Global Brands

While we honor our NDA commitments and don't publicly name our clients, we're proud to be a trusted supplier to the world's leading athletic brands. Our fabrics go into shoes worn by professional athletes and everyday runners alike. When you work with Hsu Jenn, you're tapping into the same supply chain that serves the pinnacle of the sportswear industry.

 

4. Committed to Sustainability

We're not just talking about green—we're investing in it. Our R&D team is actively developing RPET-based (recycled polyethylene terephthalate) materials for footwear applications. The future of footwear is sustainable, and we're building that future today.

 

 

 

Our Production Process

 

Greige Fabric → Dyeing → Heat Setting → In-House Lamination → Quality Inspection → Delivery
 

 

Stage

Description

Greige Fabric

Starting materials sourced and prepared in-house

Dyeing

Precise color matching with Pantone and custom specifications

Heat Setting

Dimensional stability and shape retention

Lamination

In-house bonding with Foam, EVA, PE/EVA, SBR, CR, NEO, IE/PE, AE/PE, POLIYOU, and more

Quality Inspection

Rigorous quality control at every stage

Delivery

15–20 working days lead time (with greige fabric in stock)